Documents

Photos

Links

Videos
|
|
This page
provides links to our on-line photo album. We will continually update
this page at least weekly. If you have images you would like to share,
please send them to webmaster@valleyconnex.org and we will happily add
them to our collection. It would be helpful if you could provide a short
caption, names, and date to go with each image.
| |
|
| Photo
album 1: The
construction begins! |
April 18 |
| Photo
album 2:
Progress being made! |
May
8 |
| Photo
album 3:
Spancrete planks get installed and Valley members remove parts of
the roof. |
May
24 |
Franklin
Baptist Association, Alabama- Week1:
The
first group of volunteers arrived from Alabama (Franklin
Baptist Association) and the work they accomplished by 2 pm
Monday (June 16) was outstanding! Hopefully, we can get some names
to go woth these images but we wanted to get these to you so you
can see the progress. We are so blessed to have everyone helping
us.
The work throughout
the week went great. The framing is up and ready for the next crew.
Wow! What can we say? Check out Week 2 to continue watching the
progress.
|
June
16 |
First
Baptist Church, Winfield, Missouri & Dawson Memorial Baptist
Church, Birmingham, Alabama - Week 2: Another
great week went by with much being accomplished by groups from Missouri
(First
Baptist Church - Winfield) and Alabama (Dawson
Memorial Baptist Church - Birmingham) as well as group from
our very own Kenosha Wisconsin. The roofing is in place and the
shingles are going up. Electrical boxes and some wiring is getting
installed.
We would love to
personally thank everyone for their hard work. It was warm, especially
on the roof, and everyone helped by using the gifts God has given
them. Again, we have been blessed by everyone's generosity. We are
looking forward to utilizing the new addition in order to serve
Him! Thank you everyone.
|
June
23 |
Valley
Baptist Church - Week 3: Valley
Baptist Church members are continuing the work to ready the building
for week 4 when local churches from Neenah and Green Bay join us.
Welcome Living
Vine Community Church and Highland
Crest Baptist Church.
We enjoyed the company
of the Fugates, former members that moved out east, as they helped
us ready the building for drywall. We were also fortunate to enjoy
the company of fellow brothers and sisters from Graceway
Fellowship in Green Bay. The exterior gypsom board went up,
electrical work continued, bracing was installed, and Mike from
Missouri continued to roof the existing building. Progress is not
as apparent as framing or roofing but it is being made. Again, weather
has been good.
|
June
30 |
Valley
Baptist Church - Week 4: Another week has passed
and we have Living Vine Community
Church, Highland
Crest Baptist Church, and some members from Two
Rivers Baptist Church in Nashville, Tennessee.
The framing of the
lowered ceilings on the first floor was accomplished and can be
seen in the associated photo album. The electrical work is progressing
nicely thanks to Rollie from Buss Electric. Trader Plumbing as been
working diligently as has our HVAC guys from Christensen
Heating and Air Conditioning. Advantage Fire Sprinkler just
got started installing the sprinkler pipes and we hope to pressure
test next week.
Starting Monday, July 14, Jacob's
Well members from Eau Claire will join us and begin drywalling.
|
July
5 |
Valley
Baptist Church - Week 5: Members
from Jacob's Well joined us this week and they jumped right in by
starting to drywall the basement rooms. While they cannot possibly
finish the entire
basement, they have made excellent progress and again we are so
thankful.
The sound/fire insulation
is going in, the HVAC guys are still working hard along with the
sprinkler system, and some exterior work has started. We are preparing
for windows and the new electrical service as well. There is still
a lot of work to do that everyone is staying busy and working as
part of a team. Thank you everyone!
|
July 14
|
First
Baptist Church Pinson & Riverview Baptist Church - Week 6:
We welcomed more brothers and sisters to Appleton this week. FBC
Pinson from Pinson, Alabama Riverview
Baptist Church from Franklin, Ohio - Thank you! This
large crew has made great progress on the drywalling that was started
last week. Drywall dust abounds throughout the new addition ( and
old) but it is all being done to further glorify Him so the cleanup
efforts are worth it.
The flooring selections, colors for the walls, ceilings
& door frames are being finalized since we are getting closer
to completion and will be there before you know it. Again, the weather
has been most accommodating. Note the first windows went in and
we hope to complete them soon! |
July
20
|
Weeks
7 & 8: While we are a little
behind in posting these images, the building expansion has been progressing.
The windows are in as of Aug. 8 and the drywall finishing
is completed in the lower floor. While the lower level is being primed
and painted, the main floor is being finished by some local contractors.
Our good neighbor instructed some of our youth on drywall finishing
and they have been working their new found skills in the closet areas,
leaving the main areas for the hired professionals.
Thanks to members from Mapledale
Baptist Church - Sheboygan, WI; Rick Pribnow from Jacob's Well
(again), Living Vine (thanks Herb), and Valley members this week.
Valley members will be providing most of the work until September,
when we welcome the Calvary Baptist Church volunteer group from Winston-Salem,
NC. |
July 24 |
Weeks 9 & 10: The
drywalling is completed in the main areas and the texture has been
applied. Painting comes next. The youth area has received a few coats
of red for one wall while the fellowship is now ready to receive it's
first coat.
.JPG)
The steel for the canopy is up and it does not look like it will ever
go anywhere. Carpet is has been ordered and the lower restrooms are
in the process of being tiled.
Lastly, the masons are working at bricking the exterior and it is
looking quite good. The pictures may not show much progress but it
is indeed occurring. We are now planning for the renovation of our
existing lobby and hallway. |
Aug 20
|
| |
|
| |
|
|